An approval chain is the sequence of people who must approve a request. An approval limit is the largest amount an approver may sign off on their own. Together they make sure the right level of authority sees each decision, without sending every small request to the top.

How many approvers does a request need?

As few as the risk requires. Each extra approver adds waiting time and spreads responsibility until nobody feels accountable. A simple test: if an approver has never rejected or changed anything in a year, ask whether that step is doing any work.

How do approval limits work?

Set a limit for each level of authority. A team lead might approve up to a low amount, a department head up to a higher one, and finance or directors above that. A written authority table makes this clear. For example:

AmountWho approvesWhy
Up to the first limitLine managerLow risk, close to the work
Up to the second limitLine manager, then department headBudget owner needs to agree
Above the second limitDepartment head, then financeSpending authority sits with finance

Keep the table short. Three or four levels are usually enough. Define what the amount means, such as total cost including tax, and whether limits apply per request or per period.

Should limits stop approvals or change the route?

Both have a use. A limit that stops an approver from approving above their level is a safety net. Routing, where a condition sends larger amounts to a senior step in the first place, is the design. Rely on routing for normal flow and the limit as a backstop for mistakes.

How to design the chain

  1. List the decisions and the risk each one carries.
  2. Write the authority levels and the amounts.
  3. Decide which levels can run in parallel and which must follow in order.
  4. Add a fallback for when an approver cannot be found or is away. See delegation and cover.
  5. Check that nobody approves their own request. See separation of duties.

Setting this up in ProcessIQ

On an approval step you choose a number field, such as the amount, and a limit. Above the limit the approver can reject or return but not approve. To send large amounts to a more senior approver, add a condition before the approvals, for example form.amount <= 5000, and give the default branch to the senior step. One step compares one number field with one limit, and limits do not convert currencies. The how-to is in approval limits and separation of duties, and the overview is on the delegation and limits page.